Copies an existing plan. Used to simulate special deviating planning scenarios.
Goal: Copy of an existing plan
Steps:
Go to “Manage Plans”
Select the desired plan (e.g. with prior-year figures)
Click the gear icon on the right
Select the option “Copy”
Optionally enter a new name and set the new period (e.g. 2026).
Confirm with Save
→ The plan is taken over as a 1:1 copy and can then be adjusted.

